Truck depots are not bus depots with bigger batteries
Freight return patterns, dwell time, and duty cycles vary more than urban route buses. Some trucks sit overnight with long windows; others turn mid-day with short plugs. That changes whether you size for slow high-concurrency overnight charging or fewer higher-power bays.
Battery sizes and energy per kilometre also span a wide range across rigid trucks and tractor units. Copying a bus ratio into a truck yard is a common early planning error.
The capacity questions to answer first
How much energy must be replaced before the next departure wave? What share of the fleet is on-site in the peak charging hour? What site supply (kVA/kW) exists today, and what demand charges apply on the commercial tariff?
Those answers drive charger count, kW class (for example 50 kW, 150 kW, 350 kW DC), and whether smart or peak-limited charging can keep the depot inside an existing connection while the fleet grows.
Peak demand and DNSP conversations
Uncontrolled plug-in when the fleet returns can create a sharp evening peak. Smart charging stretches energy across the dwell window and often cuts P90/P95 peak demand enough to defer augmentation — if operations will enforce the policy in the yard.
Bring a high-percentile load profile to early discussions with networks such as Ausgrid, Endeavour Energy, Essential Energy, Energex, or others relevant to the site. Simulation is planning evidence, not a formal connection offer.
Use the simulator with truck-oriented assumptions
On chargingcapacity.io, set fleet size, daily distance, charger power, and overnight window, then compare strategies. Export CSV load profiles for internal design reviews. Pair this page with the smart charging and grid connection guides for the full planning loop.
Try it on your depot assumptions
Open the free simulator, pick a depot preset, and compare uncontrolled vs smart charging before you lock charger counts or a grid story.
FAQ
How do I estimate electric truck depot charging capacity in Australia?
Estimate nightly energy and dwell windows first, then model charger count and kW under uncontrolled vs smart charging, including P90/P95 peak demand against site supply and demand charges.
Should truck depots default to high-power DC chargers?
Only if turnaround times require it. Many overnight freight patterns can use lower concurrent power with smart charging. High-power bays cost more and can force earlier grid upgrades if every vehicle charges at once.